COMMERCIAL KITCHEN UPGRADE
Aurify Constructions | British High Commission
Westminster House, Deakin, ACT
Hazardous Materials | Fitout and Refurbishment | Heritage
The project consisted of the strip out and refurbishment of the commercial kitchen and its adjoining preparation room at Westminster House for the British High Commission.
The works included the demolition of the existing kitchen with refurbishment activities including the installation of new walls, flooring, and wall tiling, as well as modifications to existing storeroom to create a coolroom. Joinery modifications were made to the prep room and a new stainless steel kitchen was installed.